Tenders
TENDERS
DivisionsTender Ref. no.Name of WorkDepartment Floated onCorrigendum(s)
Aircraft Manufacturing Division, Nasik2512_6649_E-22667INDIGENISATION OF OXYGEN RUBBER HOSEIMM11 Jul 2019Corrigendum(s) 1
Aircraft Overhaul Division, Nasik2544_361_E-22659HIGH BAY LED FITTINGSIMM08 Jul 2019Corrigendum(s) 1
Aerospace Division, BangaloreSP/IMM/9411CF-296/GV1ELECTRO PNEUMATIC VALVE WITH STATUS FEEDBACK SYSTEM - 03 typeIMM13 Jul 2019Corrigendum(s) 1
TARDC, KanpurDGD/2924/220/Pt. 11Expression of Interest (Eol) for design & development of Weather Radar for Dornier Do-228 aircraft.Design16 Jul 2019Corrigendum(s) 1
TARDC, KanpurDGD/2924/220/Pt. 10Expression of Interest (EoI) for design & development of Traffic Collision Avoidance system (TCAS) for Dornier Do-228 aircraft.Design16 Jul 2019Corrigendum(s) 1
TARDC, KanpurDGD/2924/220/Pt. 9Expression of Interest (Eol) for design & development of Radio Altimeter for Dornier Do-228 aircraft.Design16 Jul 2019Corrigendum(s) 1
TARDC, KanpurDGD/2924/220/Pt. 8Expression of Interest (Eol) for design & development of Distance Measuring Equipment for Dornier Do-228 aircraft.Design16 Jul 2019Corrigendum(s) 1
TARDC, KanpurDGD/2924/220/Pt. 15Expression of Interest (EoI) for design & development of Tacho- Generator for Dornier Do-228 aircraft.Design16 Jul 2019Corrigendum(s) 1
TARDC, KanpurDGD/2924/220/Pt. 14Expression of Interest (Eol) for design & development of Windshield Wiper System for Dornier Do- 228 aircraft.Design16 Jul 2019Corrigendum(s) 1
TARDC, KanpurDGD/2924/220/Pt. 12Expression of Interest (EoI) for design & development of Airborne Equipment of Environment Control System of Dornier Do- 228 aircraft.Design16 Jul 2019Corrigendum(s) 1
TARDC, KanpurDGD/2924/220/Pt.1_1Expression of Interest (EoI) for design & development of LRUs of Landing Gear System of Dornier Do- 228 aircraftDesign27 Jul 2019Corrigendum(s) 1
Aerospace Division, BangaloreASD/IMM/SPRWP3/B1INSOURCING OF STORES ACTIVITIESIMM16 Jul 2019Corrigendum(s) 1
Engine Division, Bangalore4393-4161/19-2/RTPROCUREMENT OF OILS, GREASE, VARNISH ETCIMM26 Jun 2019Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NEP/Advt./09/19-20Providing Air conditioning & Ventilation facility for the proposed Buildings for IDS ROH rate production building with additional MGB load test rig at MRO division, HAL(HC). Cont.No.HAL/FMD/EC-2767/19-20.Works28 Jun 2019Corrigendum(s) 1
Engine Division, BangaloreE/CM(IMM)/EOI/19-1INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR STORES MANAGEMENT FOR A PERIOD OF 2 YEARSIMM17 Jun 2019Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NEP/Advt/08/19-20Providing Internal E&M utility services comprising of Airconditioning facility, crane facility, fire alarm facility and compressed Airline facility for Production Augmentation facilities - Phase-IBuildings at LCATejas Division, HAL(BC). Cont.No.HAL/FMD/EC- 2765/19-20Works05 Jul 2019Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NEP/Advt./07/19-20Providing external power supply for Production Augmentation facilities at LCA Tejas Division, HAL(BC). Cont.No.HAL/FMD/EC-2764/19-20Works22 Jun 2019Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NEP/INT/06/19-20Replacement of existing LT Panels with new LT panels at ADB, Main Factory, ARDC, HAL(DC). Cont.No.HAL/FMD/EC-2763/19-20Works11 Jun 2019Corrigendum(s) 1
Engine Division, BangaloreE/SM(PUR)/4393-4147/19-2/rtPROCUREMENT OF CHEMICALSIMM17 Jun 2019Corrigendum(s) 1
Facilities Management Division, BangaloreFM/NEP/INT/05/19-20Providing External Power Supply to the Proposed PS2/GS2 Integration building at Aerospace Division, HAL (BC).Works08 Jun 2019
Facilities Management Division, BangaloreFM/NEP/Advt./04/19-20Providing external power facility for the proposed buildings for IDS ROH rate production building with additional MGB load test rig at MRO Division, HAL (HC). Cont.No.HAL/FMD/EC-2758/19-20Works08 Jun 2019Corrigendum(s) 1
Aerospace Division, BangaloreASD/IMM/CAP/M/140/B2VERTICAL TURN MILL CENTRE (GANTRY TYPE)IMM12 Jun 2019Corrigendum(s) 1
Corrigendum(s) 2
Sukhoi Engine Division, KoraputHBS/18QB-1018/2-98SUPPLY INSTALLATION AND COMMISSIONING OF COOLING WATER SUPPLY SYSTEM FOR FURNANCES/EQUIPMENTS AS PER ENCLOSED SPECIFICATIONIMM12 Jun 2019Corrigendum(s) 1
Aerospace Division, BangaloreASD/IMM/CAP/M/155/BA1COLD FLOW TEST FACILITY ON TURNKEY BASISIMM07 Jun 2019Corrigendum(s) 1
Corrigendum(s) 2
Rotary Wing Research & Design CentreRC/IMM/NVG/8422LRU/42/1NIGHT VISION GOGGLES FOR LIGHT UTILITY HELICOPTERIMM08 Jul 2019Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Aircraft Research & Design CentreD/IMM/COM6/5421/CAP/30/1SUPPLY, INSTALLATION, COMMISSIONING AND DEMONSTRATION OF A SERVO HYDRAULIC ACTUATOR LOADING SYSTEM & PNEUMATIC PRESSURIZATION SYSTEM AS PER THE SCOPE OF WORK or TECHNICAL SPECIFICATIONIMM03 Jul 2019Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3
Facilities Management Division, BangaloreFM/NEP/Advt./02/19-20Annual Service/works contract for carrying out Telecom Maintenance works pertaining to Facilities Management Division and allied facilities, HAL(BC). Cont No.HAL/FMD/ER-2760/19-20.Works25 May 2019Corrigendum(s) 1
Corrigendum(s) 2
Helicopter Division, BangaloreH/HD/DGM(OS)/RFQ-ALH(CIVIL)ToT/35/19RFQ for Manufacture of Upgraded Dhruv(ALH) Civil Helicopter under ToT from HALOutsourcing12 Jul 2019Corrigendum(s) 1
Corrigendum(s) 2
Sukhoi Engine Division, KoraputHBS/18AB-1005/3-48SUPPLY INSTALLATION COMMISSIONING PROVEOUT AND TRAINING OF SCREW CUTTING LATHE CENTR HEIGHT 320 MM AS PER ENCLOSED SPECIFICATIONIMM10 Apr 2019Corrigendum(s) 1
Sukhoi Engine Division, KoraputHBS/COURIER CARGO CONTRACT/19-21COURIER CARGO CONTRACT FROM VISAKHAPATNAM TO VARIOUS PARTS OF INDIA AND VICE VERSA FOR PERIOD OF TWO YEARSIMM16 Mar 2019Corrigendum(s) 1
Corrigendum(s) 2
Corrigendum(s) 3