HAL ADOPTS MAKE-II
MAKE-II

Introduction

  • The objective of the procedure is to utilise the emerging dynamism of private sector, wider participation of Indian industry and provide impetus to MSME/start-ups sector for achieving substantive self-reliance in defence production. 
  • Under this procedure, Supply Order is assured to the selected Development Agency (DA) upon successful acceptance of the developed product where the Design & Development (D&D) cost is reimbursed progressively with supplies.

HAL Make-II Procedure

HAL Make-II Procedure
Size:661 KB.
 

Corporate Level Nodal Officer:

General Manager (Indigenization)
Hindustan Aeronautics Limited
Corporate Office
15/1, Cubbon Road
Bangalore – 560001
Tel: 080 22320664
Fax: 080 22320361
Email: gm.indg@hal-india.co.in

List of items for Make-II

List of items for Make-II
Size:669 KB.
01 Oct 2020

EOIs Issued

Aug 2020

Aug
Name of Work Floated date Due date
INVITATION FOR EXPRESSION OF INTEREST from MSMEs OR Startups FOR INDIGENISATION OF SHOCK ABSORBER TYPE ASD OF ART 30PI PROJECT UNDER MAKE II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED  04-Aug-2020 06-Oct-2020
Indigenisation of Voltage Stabilization Valve 
04-Aug-2020 06-Oct-2020
INVITATION FOR EXPRESSION OF INTEREST (EoI) FOR INDIGENISATION OF ‘’MICROPROCESSOR BASED COMMUTATION MODULE’’ OF EMI/EMC SYSTEM OF SU30 AIRCRAFT UNDER MAKE - II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED 11- Aug -2020 15-Sep-2020
INVITATION FOR EXPRESSION OF INTEREST (EoI) from MSME’s / Startups FOR INDIGENISATION OF ‘’MICROPROCESSOR BASED PROCESSOR MODULE’’ OF EMI/EMC SYSTEM OF SU30 AIRCRAFT UNDER MAKE - II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED  11-Aug-2020 15-Sep-2020
INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR INDIGENISATION OF MICROWAVE RECEPTION MODULE (MWR) OF RADAR PROJECT UNDER MAKE – II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED  11-Aug-2020 15-Sep-2020
INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR INDIGENISATION OF RECEIVER AMPLIFIER OF RADAR PROJECT UNDER MAKE – II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED 11-Aug-2020 15-Sep-2020
INVITATION FOR EXPRESSION OF INTEREST (EoI) FOR INDIGENISATION OF ‘’MICROPROCESSOR BASED INTERFACE MODULE’’ OF EMI/EMC SYSTEM OF SU30 AIRCRAFT UNDER MAKE - II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED 11-Aug-2020 15-Sep-2020
INVITATION FOR EXPRESSION OF INTEREST (EOI) from MSMEs / Startups FOR INDIGENISATION OF NON-CONTROLLABLE PROTECTIVE DISCHARGER OF RADAR PROJECT UNDER MAKE – II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED  11-Aug-2020 15-Sep-2020
INVITATION FOR EXPRESSION OF INTEREST (EOI) FORINDIGENISATION OF TRAVELLING WAVE TUBES (TWT) FOR USE IN TRANSMITTER OF RADAR CONTROL SYSTEM (RLSU) PROJECT FOR SU-30 AIRCRAFT UNDER MAKE – II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED 11-Aug-2020 15-Sep-2020
INVITATION FOR EXPRESSION OF INTEREST (EOI) from MSMEs / Startups FOR INDIGENISATION OF VOLTAGE STABILIZER FOR USE IN DRIVE CONTROL DEVICE OF RADAR CONTROL SYSTEM (RLSU) PROJECT FOR SU-30 AIRCRAFT UNDER MAKE – II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED 11-Aug-2020 15-Sep-2020
INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR INDIGENISATION OF FREQUENCY SYNTHESIZER OF RADAR PROJECT UNDER MAKE – II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED 11-Aug-2020 13-Oct-2020
INVITATION FOR EXPRESSION OF INTEREST (EOI) from MSMEs / Startups FOR INDIGENISATION OF RF FREQUENCY MODULATOR OF RADAR PROJECT UNDER MAKE – II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED 11-Aug-2020 13-Oct-2020
INVITATION FOR EXPRESSION OF INTEREST (EOI) FORINDIGENISATION OF RF FREQUENCY MULTIPLIEROF RADAR PROJECT UNDER MAKE – II PROCEDURE OF HINDUSTAN AERONAUTICS LIMITED 11-Aug-2020 13-Oct-2020
EXPRESSION OF INTEREST FOR DESIGN AND DEVELOPMENT OF SPARES AND CONSUMABLES USED IN Su 30MKI AIRCRAFT AGAINST MAKE II 08-Aug-2020 19-Sep-2020

Jul 2020

Jun 2020

Jun
Name of Work Floated date Due date
EXPRESSION OF INTEREST (EOI) FOR DESIGN & DEVELOPMENT OF WEATHER RADAR FOR DO-228 AIRCRAFT 
30-June-2020 14-August-2020

.